Demo Right Roofing is a fictional Launch Labz template. Roofing-business website built in 72 hours from $149. See Launch Labz →
Storm response active · Worcester County 24/7 MA HIC #178421 · 508-555-0173
MA HIC #178421 · GAF Master Elite · Family-owned since 2008

Roofs built for New England weather.

Worcester County roofing crew. 24-hour storm response, GAF Master Elite installation, manufacturer warranties up to 50 years, financing on every job.

★★★★★ 4.9 612 jobs in 2024 Fully insured · 2M liability
17 yrs
In business
4200+
Roofs installed
50yr
Manufacturer warranty
24 hr
Storm response
GAF
Master EliteTop 3% nationally
OC
Owens Corning PlatinumPreferred contractor
MA
HIC #178421MA Home Improvement
EPA
Lead-Safe CertifiedPre-1978 homes
The truth about New England roofs

Roofs don't fail in summer. They fail in February.

Worcester gets 64 inches of snow a year, six nor'easters, and an ice-dam season that lasts most of January. The damage compounds. By the time you can see it from the driveway, you have decking rot, attic mold, or a stain on the kids' bedroom ceiling.

01 · After the storm

Wind-lifted shingles.

A 50 mph gust pulls tabs and pops nails. Water finds the smallest opening. By spring you have decking rot under tabs that look fine from the ground.

02 · Ice-dam season

Water that goes uphill.

Ice dams force meltwater back under shingles, past the underlayment, and into the insulation. Most New England homes built before 1995 lack proper ice-and-water shield up the rakes.

03 · The slow leak

It travels three feet inside the wall.

The stain on your ceiling rarely comes from directly above. By the time it shows, water has run a beam, soaked insulation, and started on the drywall behind it.

How we work

We build for weather, not for season.

Three things this crew will not compromise on. The certification level. The materials we install. The response window in storm season. Everything else is negotiable.

01

GAF Master Elite installation.

Top three percent of GAF-certified roofers nationally. Required for the Golden Pledge 50-year warranty. We have held the certification since 2014.

02

24-hour storm response.

Tarps, emergency boards, leak isolation — same day during storm season, next day always. Your insurance adjuster sees a documented, mitigated site.

03

Financing on every job.

Zero-percent APR for 12 months on approved credit. Conventional 36 and 60-month plans. Pre-qualify at the inspection — no impact on credit.

What we install

Five service tracks. One licensed crew.

Every track runs through the same Worcester-based crew. No subcontractors on residential. Commercial uses our two-man flat-roof team plus the same supervisor.

Asphalt Shingle Re-Roof Most installed
Full tear-off, new ice-and-water shield up rakes and valleys, GAF Timberline HDZ default. 50-year manufacturer warranty available.
1–3 daysTypical install
Architectural Upgrade
Tier-up to Camelot or Grand Sequoia profiles. Adds visual depth and weight; reads as slate from the curb. 50-year warranty.
2–4 daysBy square count
Standing-Seam Metal
22-gauge or 24-gauge panels. Snap-lock or mechanically seamed. 50-year material warranty. Best for low-slope additions and modern builds.
3–5 daysCustom fabrication
Slate / Cedar Shake Restoration
For Victorians and pre-1940 homes. Selective replacement, copper flashing, period-correct ridge work.
5–10 daysPer phase
EPDM Rubber Flat Roof
60-mil membrane, fully adhered or mechanically fastened. Best for older Worcester multi-family with parapets.
2–6 daysPer unit
TPO Single-Ply
White reflective membrane, 60-mil or 80-mil. Energy code compliant. Best for newer commercial and warehouses.
2–7 daysPer phase
Modified Bitumen (Mod Bit)
Cap-sheet system over base ply. Common on triple-deckers. Re-coverable and patchable in spot-repair scenarios.
3–6 daysBy square count
Multi-Family / HOA Coordination
Phased install across multiple buildings. Trustee-meeting scheduling, unit-owner notifications, common-element documentation included.
2–6 weeksProject-scale
Emergency Tarp & Mitigation 24-hour
Same-day tarp during storm season, next day always. Photo documentation for your adjuster. Mitigation invoiced separately if insurance pays it.
Same dayStorm response
Wind / Hail Damage Repair
Spot replacement for wind-lifted tabs, hail-bruised shingles, and storm-displaced flashing. Documented for insurance supplements.
1–2 daysPer repair
Ice-Dam Removal & Prevention
Steam removal (no salt, no chiseling), then root-cause work on attic insulation and ice-and-water shield. Most clients only need it done once.
Same dayRemoval
Insurance Claim Support
We meet your adjuster on the roof, document the damage, and write the supplement. We have done this hundreds of times.
No chargeIf we install
Seamless Aluminum Gutters
5-inch or 6-inch K-style. Hidden hangers every 24 inches. Color-matched to your trim or fascia. Single-day install.
1 dayTypical home
Half-Round Copper
For Victorians and historic homes. Period-correct profile, soldered seams, copper downspouts and conductor heads.
2–4 daysCustom fab
Step & Counter Flashing
Wall intersections, chimneys, dormers. Re-flash whenever we tear off — most leaks come from old flashing, not old shingles.
IncludedWith re-roof
Gutter Guards
Stainless micro-mesh. Add-on at the time of gutter install. Real ones, not the foam inserts.
+1 dayAdd-on
Free Roof Inspection
Walk the roof, drone the perimeter, check the attic, photo-document everything. Quote within 48 hours.
FreePre-purchase / post-storm
Pre-Purchase / Real-Estate Report
Written report for buyers. Estimated remaining life, deferred-maintenance items, replacement cost. PDF delivered same day.
$195Flat fee
Insurance / Storm-Damage Report
Documentation packet for insurance supplement. We meet your adjuster on the roof and walk them through the damage.
No chargeIf we install
Annual Maintenance Inspection
Yearly check after install. Free for the first five years on any roof we install. Catches loose flashing and sealant before winter.
FreeLifetime, our installs
The proof

Drag to see what a tear-off does.

Wind-damaged shingles after a November nor'easter, left side. Same panel two days later: full tear-off, new ice-and-water shield, GAF Timberline HDZ in Charcoal. Right side.

Before · wind damage After · new install
Spencer, MA · Wind damage from Nov '24 nor'easter
Full tear-off GAF HDZ · Charcoal Drag the handle ⇄
Why Right Roofing

Four operational receipts. No "trusted partner" copy.

Roofing is a trade where the difference between a good crew and a bad one is documented. These are the four numbers we're audited on.

Top 3% nationally

GAF Master Elite

Held the certification since 2014. Only 3% of GAF-certified roofers nationally qualify. Required for the Golden Pledge 50-year warranty.

  • 50-yr Golden Pledge
  • 10-yr workmanship
  • Transferable to next owner
  • Annual factory training

24-hour storm response.

Tarps, emergency boards, leak isolation. Same day during storm season, next day always. We have hit this for every nor'easter since 2018.

4200+

Roofs installed since 2008

Family-owned since '08.

Same crew chief on every job. No phone-tag handoffs to a sales office. The number on the truck is the number you call.

How a job runs

Four steps. We handle the paperwork.

From inspection to install, the same flow. Insurance work follows the same path with one extra step (the supplement) we handle for you.

Inspect

Walk the roof, drone the perimeter, check the attic. Photos shared with you and (if applicable) your adjuster.

Day 0–1

Quote

Line-itemized scope, materials list, financing pre-qualification. No surprises, no upsells at the door.

Within 48 hrs

Schedule

Material order, dumpster, crew assignment. Weather-watched daily. We move only if forecast is over 50%.

Day 7–14

Install

Tear-off, deck inspection, ice-and-water shield, underlayment, shingles, flashing. Photos at every stage.

1–3 days
Service area

Worcester-based. The county covered.

Free travel inside a 20-mile radius of Worcester. Beyond that, a small mileage fee that we'll quote before booking — never after.

  • WorcesterBase
  • Shrewsbury5 mi
  • Auburn5 mi
  • Holden8 mi
  • Westborough12 mi
  • Northborough10 mi
  • Marlborough16 mi
  • Millbury7 mi
  • Sutton10 mi
  • Spencer14 mi
Service radius · 20 mi
Reviewed by 612 clients

The reviews are written by neighbors.

★ 4.9 across Google. The three below are recent — chosen because each is a different town and a different scope.

★★★★★
"Came home to a tarp and a leak in the ceiling after the December nor'easter. Right Roofing had a crew on the roof within 24 hours and replaced the entire south slope in two days. Insurance covered most of it. Couldn't have asked for better."
K. MahoneyHolden
★★★★★
"Three quotes for a Victorian re-roof. Right was the only crew that mentioned ice-and-water shield up the rakes — which is what New England code actually calls for. Picked them. No surprises in the bill."
D. LopesWorcester
★★★★★
"Own a triple-decker in Auburn. Right's been my roofer for both buildings since 2018. They show up when they say, leave the lawn cleaner than they found it. Old-school in the right ways."
M. TexeiraAuburn
Reviewed on Google Angi Better Business Bureau NextDoor
Yes. Zero-percent APR for 12 months on approved credit, plus conventional 36 and 60-month plans through our financing partner. We can run pre-qualification at the inspection — no impact on credit.
One to three days for a typical residential re-roof, weather permitting. Larger Victorians, multi-family, or steep-pitch jobs add a day. Commercial timelines vary by square footage.
Yes. We coordinate directly with your adjuster, document the damage, and submit the supplement. You stay out of the back-and-forth — we have done this hundreds of times.
Up to 50 years on the manufacturer warranty (GAF Golden Pledge or Owens Corning Platinum) plus 10 years on our workmanship. Both transfer to the next homeowner.
Massachusetts HIC #178421. Two million in general liability, full workers compensation, EPA Lead-Safe Certified for any pre-1978 home. Documentation provided at inspection.
We tear off, always. Massachusetts code allows up to two layers, but we do not recommend layering — it traps moisture, voids most manufacturer warranties, and adds dead load. Tear-off is included in every quote.
Tarp protocol from the moment we open the deck. No exposed sheathing left overnight. If the forecast is over 50 percent, we reschedule — no penalty, no rescheduling fee.
GAF Timberline HDZ is the default. We also install CertainTeed, Owens Corning, IKO, standing-seam metal, slate, cedar shake on historic homes, and EPDM/TPO on commercial.
Booking spring 2026

Free inspection. No-pressure quote.

Walk the roof, drone the perimeter, check the attic. Quote within 48 hours, line-itemized. We don't run the high-pressure sales playbook — pick a different roofer if that's what you're shopping for.

Storm response · 24/7 hotline · 508-555-0173
142 Shrewsbury Street Worcester, MA 01604 508-555-0173